This project in photos!
The solar shade installed at Gestelia covers 250 m² and is equipped with 69 Dualsun FLASH photovoltaic panels. These panels produce electricity for the building’s own consumption. The results are clear:
- In summer, solar production is more than four times higher than the site’s consumption.
- Gestelia consumes a large part of the electricity produced and sells the surplus back to the grid.
- At their old site, the electricity bill amounted to €1,400 per year; today, thanks to the solar installation and the energy efficiency of the new building, expenses have fallen dramatically, with an estimated return on investment of less than 10 years over a lifespan of more than 30 years!
The administrative procedures, which are often complex in this type of project, were handled entirely by Dualsun’s partner, allowing the company to focus on its business.
For Stéphane, performance monitoring is also a key asset. Thanks to the Enphase app, he can monitor the building’s photovoltaic production and consumption in real time, allowing him to adjust usage and optimize self-consumption.
Finally, the shade structure is not only beneficial in terms of energy: it is also used to recharge the company’s fleet of electric vehicles.
In Albi, solar production is at its peak during the day, precisely when employees park and need to recharge their vehicles. It is therefore a smart and coherent system, perfectly suited to their operating mode.
Thanks to this solar installation composed of Dualsun FLASH panels, Gestelia now has a high-performance, sustainable, and energy-autonomous building.
The project is fully in line with Stéphane’s vision: combining environmental responsibility, energy intelligence, and economic efficiency. Between the quality of the insulation, local solar production, and integrated electric charging, Gestelia’s new site is now a concrete example of a successful transition to a more sober and intelligent model.
Photo credit and installation: Chris Solaire