Installed in February 2019 in Queensland, Australia, this Dualsun hybrid solar panel installation was carried out by our Australian partner Supreme Heating a pool heating specialist.
The project is located in the city of Ivanhoe. These 27 Dualsun hybrid solar panels will be used to heat Mr. Pead’s swimming pool for the thermal part. The photovoltaic part of the Dualsun solar panels will be used for the needs of the house.
The hybrid installation is completed by standard photovoltaic solar panels.
Similar installations
-
2026
Aubagne, France
-
Panels : 10 Dualsun MAX hybrid panels
-
Power output : 4,5 kWc + 8,5 kWth
Find out more
-
2025
Chantonnay, France
-
Panels : 14 MAX hybrid solar panels
-
Power output : 6 kWc + 12,53 Kwth
Find out more
-
2023
Roaillan, France
-
Panels : 12 photovoltaic panels
-
Power output : 6 kWp
Find out more
Ready to start your solar project?
Discover the best Dualsun solar installation adapted for your energy needs.
Go solar with Dualsun